AI-powered site intelligence, deal strategy, and objection handling for commercial solar.AI-powered BD intelligence for commercial solar.
Postcode triggers live PVGIS solar data and DNO region lookup.
Instant screening calculators. Indicative only — not a design.
Battery storage screening for a PV system. Sizes to soak up exported surplus.
Screening estimate from annual figures. Firm sizing needs half-hourly consumption data. Battery adds G99 scope and fire-safety siting requirements (ventilation, separation, detection).
Workplace EV charging feasibility against the site supply.
All EV connections are notifiable to the DNO (ENA process). Workplace Charging Scheme grants may apply — check current OZEV rules. Confirm maximum demand from half-hourly data before design.
Lighting retrofit savings — the fastest payback on most commercial sites.
At 27p/kWh blended commercial rate. Excludes emergency-lighting compliance work and control gains (PIR/daylight dimming typically add 15-30% further savings).
What the incoming supply can actually host — before anyone drives to site.
Indicative screening using nominal supply capacity. G98: ≤3.68 kW per phase connect-and-notify. Above that is a G99 application. Export limits depend on the DNO's network — check the capacity map for the postcode.